Boys Rooms

10/13/09

Home
Update Blog
Original Photos
Ripout Photos
The Framing
The Bomb Shelter
Insulation
Drywall
Electrical
Mechanical Room
Painting
Boys Rooms
Misc

 

Boys Rooms

Time To re-frame the boys doors April 2008

Finish up the drywall 4/6/2008:

Now all we need is some spackle and paint. Perhaps we can get that done before winter.. (ha ha)

 

Original photos after the first reframing 4/5/2008:

 

 

Home | Update Blog | Original Photos | Ripout Photos | The Framing | The Bomb Shelter | Insulation | Drywall | Electrical | Mechanical Room | Painting | Boys Rooms | Misc

This site was last updated 10/13/09